Offer

Steps for Exchange Server to HCL Domino Migration

Follow the step-by-step guide to transfer data from Exchange to Domino using SysTools Migrator.

Migration Procedure

STEP 1

Download and install SysTools Migrator on your system. While launching, you will be prompted to provide the Administrator ID and password (for the computer you are using) for authentication.

If your tool is not activated, then see the activation steps here. Activation Steps

Access the help section from the left navigation panel to view documentation and prerequisites.

Access help section

STEP 2

Select "Exchange" as the Source platform and "Notes" as the Destination platform in the Setup tab.

Select endpoints

STEP 3

Select the desired workloads to migrate, such as Email, Contact, and Calendar.

Select workloads

Configure the setup to migrate only the Email workload.

Email workload

Configure the setup to migrate only the Contact workload.

Contact workload

Configure the setup to migrate only the Calendar workload.

Calendar workload

STEP 4

Apply date filters to specific workloads to migrate data within a defined date range.

Date filters

Proceed to the next step after finalizing workload selection and date filters.

Finalize setup

STEP 5

Navigate to the Source tab to begin configuring the Exchange Server credentials.

Source tab

User Account Must be Impersonated. You can find the steps here: Exchange Impersonation

Select the appropriate Exchange Server version from the dropdown menu (e.g., Exchange 2013).

Exchange version

STEP 6

Enter the Admin Email address for the source Exchange environment.

Admin email

Enter the corresponding Admin Password for the source account.

Admin password

Input the Active Directory IP address.

AD IP

Input the Exchange Server IP address.

Exchange server IP

Check the "Include Sub Domain" box if sub-domains are to be included in the migration.

Subdomain selection

STEP 7

Click the "Validate" button to verify the source credentials and connectivity.

Validate source

Ensure all permissions turn green indicating successful validation, then click "Next".

Source success

STEP 8

Ensure all pre-requisites are complete. You can find the steps here: Domino/Notes Pre-Requisites

In the Destination tab, click "Validate" to authenticate the connection to the Domino Server.

Validate destination

Confirm successful validation of destination permissions and click "Next".

Destination success

STEP 9

Navigate to the Users tab to choose between fetching users, importing users, or downloading a template.

User mapping page

Select "Fetch Users" to automatically retrieve user accounts from the source server.

Fetch users

Click "Continue" to proceed with fetching users from the configured source account.

Confirm fetch

Confirm the number of users fetched successfully by clicking "OK".

Fetch success

STEP 10

Click "Download Template" to obtain the CSV file format for manual user mapping.

Download template

Save the sample CSV template to the local system.

Save template

Locate the downloaded CSV template file on the computer.

Locate template

Edit the CSV file to map Source Users to Destination Users and define license usage.

Edit CSV

Click "Import Users" to upload the prepared CSV file containing the user map.

Import button

Browse for the user list CSV file within the Import Users dialog.

Upload file

Select the populated CSV file and click "Open".

Open CSV

Click "Upload" to load the user mapping data into the tool.

Finalize upload

Acknowledge the completion of the user import process by clicking "OK".

Import complete

STEP 11

Review the list of users populated in the dashboard.

Review users

Select the users to migrate and click "Validate" to check source and destination account status.

Validate user list

Confirm successful user validation by clicking "OK".

User validation success

STEP 12

Now, switch to the settings page. Adjust the "Concurrent user" slider in the Settings tab to define the number of concurrent users processed per account.

Migration settings

STEP 13

Click the "Start Migration" button to begin the migration process for validated users.

Start migration

Review the license consumption summary and click "Start" to initiate the migration.

Confirm start

Acknowledge the "Migration started successfully" confirmation message.

Success prompt

STEP 14

Monitor the "Pending" tab to view users waiting to be processed.

Pending list

Monitor the "In Progress" tab to view the real-time status of active migrations.

In progress active status

Check the "Completed" tab to view users whose migration has finished successfully.

Completed list

STEP 15

Access the "Re-Run Migration" menu to view options for re-processing users.

Rerun options

Select "Retry Failed Items" to attempt migrating only the items that failed previously.

Retry failed items

Select "Delta Migration" to migrate only new data arrived since the last migration.

Delta migration

Select "Re-Run Full Migration" to restart the entire migration process for selected users.

Restart full migration

STEP 16

Expand the "Download Report" menu to access report options.

Reports menu

Save the Migration Summary Report CSV file to a local directory.

Save summary CSV

Select users and click "Download" to generate a detailed migration report.

Generate detailed migration report

Click "Download" on the confirmation prompt after report generation is complete.

Download prompt after generation

Save the compressed Detailed Report file to the local system.

Save report file

Free Download SysTools Exchange to Domino Migrator Download Now